How to Replace a Bathtub Yourself: Removing and also Replacing.

Schedule Appointment Now

Have you been searching for insight about How to Install a Bathtub?


Tools You Need to Install a New Bathtub
Installing a bathtub isn't exactly rocket science, but it does require strong plumbing, woodworking, and also often, tiling abilities. Replacing an old tub with a new one is also a moderately difficult task. If the old bathtub is easily easily accessible, the job can move quickly; if you have to open up a wall surface to eliminate the old tub and position the brand-new bath tub, the job is much harder. In either instance, the job is within a house handyman's skills, although you will require an assistant to leave the old tub and also embeded in the brand-new one. Ensure you have certified on your own for the task and are comfortable trying it. Instead of hiring a contractor to take control of a halfway-completed job, it is much better to consider using one prior to you begin. Opportunities are you might need a professional plumber to make tube links.
This short article will aid you set up a new bath tub in your shower room if you have currently gotten a new bathtub as well as don't require to change the setup of your previous water system pipes.
Your devices as well as material list should consist of the following:
  • New Tub

  • Hammer

  • Pipe Wrenches

  • Prybar

  • Shatterproof glass

  • Level

  • Pliers

  • Flexible Wrench

  • Putty Knife

  • Screwdriver

  • Cold Knife

  • Tape Measure

  • Pipe Caps


  • Removing Old Touches


    If you need to change old taps with brand-new ones as a part of your installation, after that the first thing you ought to do is separate the supply of water. After doing so, turn on the faucets to drain any type of water remaining in the system. The procedure of removing the existing faucets can be quite troublesome due to the limited access that is typically the case.
    Utilize a container wrench (crowsfoot spanner) or a tap device to undo the nut that attaches the supply pipes to the faucets. Have a cloth prepared for the continuing to be water that will originate from the pipes. When the supply pipelines have been gotten rid of, use the exact same device to loosen the nut that holds the faucets onto the bath/basin. You will require to stop the solitary faucets from turning throughout this procedure. When the faucets have been eliminated, the holes in the bath/basin will certainly have to be cleaned up of any kind of old sealing compound.
    Prior to moving on to fit the new faucets, compare the pipe links on the old faucets to the new taps. If the old taps are longer than the new faucets, after that a shank adapter is required for the new faucets to fit.

    Fitting New Taps


    If the tails of the brand-new faucets are plastic, then you will need a plastic adapter to prevent damage to the string. One end of the adapter fits on the plastic tail of the tap and the other end gives a link to the existent supply pipes.
    If you require to fit a monobloc, after that you will require decreasing couplers, which attaches the 10mm pipeline of the monobloc to the standard 15mm supply pipe.
    Next off, place the faucet in the mounting hole in the bath/basin guaranteeing that the washing machines remain in area between the tap as well as the sink. Protect the faucet in position with the supplier provided backnut. Once the tap is safely in position, the supply pipelines can be attached to the tails of the faucets. The faucets can either be linked by utilizing corrugated copper piping or with typical faucet ports. The previous kind needs to be attached to the tap ends first, tightening only by hand. The supply pipes can later be connected to the other end. Tighten both ends with a spanner after both ends have been linked.

    Setting up the Tub


    Utilizing both wood boards under its feet, put the tub in the needed setting. The wood boards are practical in equally spreading out the weight of the bath tub over the location of the boards rather than concentrating all the weight onto four small points.
    The next goal is to ensure that the bathtub is leveled all round. This can be achieved by examining the level and also readjusting the feet on the bath tub up until the level checks out level.
    To install taps, fit all-time low of the outermost adaptable faucet port to the suitable supply pipe by making a compression join; then do the very same for the various other faucet.
    Turn on the supply of water as well as check all joints and brand-new pipework for leakages as well as tighten them if required. Fill the bathtub as well as additionally inspect the overflow outlet and the regular electrical outlet for leaks.
    Finally, fix the bathroom paneling as explained in the producer's instruction manual. Tiling and securing around the tub ought to wait until the bath tub has been used at the very least when as this will settle it right into its final position.

    Planning for the Setup


    First of all, the supporting structure supplied with the bath needs to be fitted (if required) according to the supplier's directions. Next, fit the faucets or mixer to the tub. When fitting the faucet block, it is essential to make sure that if the faucet comes with a plastic washing machine, it is fitted between the bathroom as well as the taps. On a plastic bathroom, it is also reasonable to fit a supporting plate under the faucets system to prevent stress on the bathtub.
    Fit the adaptable tap adapters to the bottom of the two faucets utilizing 2 nuts and olives (often supplied with the bathtub). Fit the plug-hole outlet by smearing mastic filler round the sink electrical outlet hole, and afterwards pass the outlet via the hole in the bath. Make use of the nut supplied by the supplier to fit the plug-hole. Take a look at the plug-hole outlet for an inlet on the side for the overflow pipe.
    Next off, fit the end of the adaptable overflow pipe to the overflow electrical outlet. After that, screw the pipeline to the overflow face which should be fitted inside the bathroom. Make sure you utilize every one of the supplied washing machines.
    Attach the trap to the bottom of the waste electrical outlet on the bathtub by winding the string of the waste electrical outlet with silicone mastic or PTFE tape, as well as screw on the catch to the outlet. Link all-time low of the overflow tube in a similar manner.The bathroom should now prepare to be fitted in its last placement.

    Tiling Around the Bathtub


    In the area where the bathroom meets the ceramic tile, it is essential to seal the accompanies a silicone rubber caulking. This is necessary as the fitting can relocate sufficient to break a stiff seal, creating the water to penetrate the wall surface in between the bath as well as the tiling, causing complications with moisture and also feasible leaks to the ceiling below.
    You can pick from a selection of coloured sealants to blend in your components and also fittings. They are offered in tubes as well as cartridges, and also are capable of sealing spaces approximately a size of 3mm (1/8 inch). If you have a larger gap to fill up, you can load it with spins of soaked newspaper or soft rope. Keep in mind to constantly load the bath tub with water before sealing, to enable the motion experienced when the bathtub remains in use. The sealant can break relatively very early if you do not think about this activity prior to sealing.
    Alternatively, ceramic coving or quadrant ceramic tiles can be used to edge the bath or shower tray. Plastic strips of coving, which are easy to use and cut to size, are likewise conveniently readily available on the marketplace. It is advisable to fit the tiles using water-resistant or water resistant adhesive and grout.

    A Step-by-Step Guide to Installing a Bathtub


    Is your bathtub looking a bit dated lately? Believe it or not, installing a new one is a project you can do yourself. Whether your bathtub is broken or doesn’t fit in with your current bathroom’s design, you can fix it without having to hire a contractor or paying labour costs.



    But, beyond saving money, there are other benefits of installing your own bathtub. When you do this project yourself, you can customise every step of the process. You can also make sure the finished product looks exactly the way you want it to.



    This DIY project is quite involved, but by doing some research, preparing your bathroom and using the right equipment, it is definitely one you can take on. This guide will help you understand the technical procedures behind installing a new bathtub.


    Remove the Existing Bathtub


    To remove the old bathtub, you will need to turn the water supply off before you start any work. After you turn the water off, there will likely still be some water left in your plumbing system, which you can remove by turning on a faucet below the level of the bathtub. Once the water stops running, you are ready to start working.



    The easiest way to remove the tub is to remove the faucet, handles and other piping and then pull the tub out from the wall. If this doesn’t work in your situation, you will need to remove part of the wall, remove the piping and then slide the tub out.


    Choose the Right Bathtub


    The ideal way to replace your bathtub is to find one that has the exact dimensions and has the drain and faucet on the same side as your old one. This way, it will fit in the same place and you won’t have to change the piping system in your bathroom. Choose a tub that matches your home’s decor and fits with the style of the bathroom.


    Install the Plumbing and Ledger Board


    You can purchase a tub drain kit at a hardware store which will have all the pieces you will need for your new tub’s plumbing. Follow the instructions that came with the kit to install the plumbing in the new tub and then take measurements to make sure the plumbing in the tub will align with the plumbing in your bathroom. If it doesn’t, now is the time to make necessary adjustments.



    Some bathtubs need a ledger board that is installed on the wall behind the tub to help support it. If your new bathtub requires one, the directions that came with it will tell you how high it should be installed. If your old bathtub had a ledger board, and it is still in good condition, you can adjust its height to match the new bathtub.


    Install the Bathtub


    When the plumbing and ledger board are ready, you can install the new bathtub. Carefully lower it into the space, being careful not to damage the tub, wall, plumbing or ledger board. Since bathtubs are very heavy and you will need to line the tub up exactly, it is wise to have someone help you with this step.



    Once the tub is in place, it needs to be perfectly level, so use a bubble level instead of estimating how level the tub is. Put the level on the top edge of the tub, not the bottom on the inside, since many tubs are designed with a sloped bottom.



    If the bathtub isn’t level, adjust the ledger board and shift the tub until it is. When it is level, use screws to attach the tub to the wall studs. Most bathtubs have pre-drilled holes in the upper flange, so use these but do not over tighten the screws.


    Hook up the Plumbing


    Now that the bathtub is installed, it needs to be attached to your plumbing system. First, install the shoe fitting under the tub and drain pipe, then the overflow pipe and then the drain flange. Your tub plumbing kit will include specific instructions on how to install these pieces.


    Install the Bathtub Surround


    A bathtub surround will protect the walls around the tub from water damage and can give your new bathtub a more finished look. To install one, make sure the wall is completely clean and dry so that the adhesive will be able to hold the surround securely. Then, measure the surround and mark the same dimensions on the wall above the tub.



    Following the directions that came with the surround adhesive, apply it to the wall. Press the surround against the wall on top of the adhesive and then pull it away for about three minutes to activate the adhesive, then apply the surround again. Keep in mind that this is the most common way to use an adhesive, but you should check the instructions on the package for any special steps.



    If there is any excessive adhesive around the sides of the surround, you can use mineral spirits to remove it. Then use masking tape to hold the surround panels in place until the adhesive is dry. Using silicone, seal all the cracks between the surround panels and the gap between the bottom of the panels and the top of the bathtub.



    If you want to install tile above your bathtub, instead of a bathtub surround, the process will be very similar. But, you will need to measure and cut tiles and install each one individually, using tile spacers to make sure they are evenly spaced. You will then use grout to fill in the spaces between the tiles.

    https://www.hss.com/blog/bathroom/a-step-by-step-guide-to-installing-a-bathtub/


    How to Install a Bathtub Yourself

    Do you really like more info about How to Install a Bathtub: Install an Acrylic Tub and Tub Surround? Give feedback down below. We'd be interested to hear your suggestions about this blog posting. Hoping that you visit us again soon. I beg you take the time to share this blog post if you enjoyed reading it. I thank you for reading our article about Tools You Need to Install a New Bathtub .



    Details Here

    Leave a Reply

    Your email address will not be published. Required fields are marked *